25kw 30kva mobile diesel silent trailer power for generator price
| Genset Model |
ON-80 |
| Prime Power(50HZ) |
24KW / 30KVA |
| Frequency/Speed |
50Hz/1500rpm |
| Standard Voltage |
400V/230V |
| Phases |
Three phases, four wires |
| Engine Data |
| Manufacturer |
shangdong kofo engine company |
| Model |
N4100DS-30 |
| Engine speed |
1500rpm |
| Standby power |
33 kWm |
| Type |
4 stroke , Vertical in-line, 4 cylinder |
| Aspiration |
Turbocharged |
| Bore * Stroke |
100×115mm |
| Displacement |
3.61L |
| Compression ratio |
19:01 |
| Fuel consumption rate |
≤251g/kW.h |
| Alternator Data: leroy somer optional |
|
| Manufacturer |
Electro-technique (Fuzhou) Company Ltd. |
| Model |
184G |
| Output power |
1 |
| AVR model |
S460 |
| Number of phase |
3 |
| Power factor (Cos Phi) |
0.8 |
| Altitude |
≤ 1000 m |
| Overspeed |
2250RPM |
| Number of Pole |
4 |
| Exciter type |
Shunt |
| Insulation class |
H |
| Voltage regulation |
±0.5% |
| Total harmonics (TGH/THC) |
no load < 2% - on load < 4% |
| Wave form : NEMA = TIF |
< 50 |
| Bearing |
single |








Our Services
Guangling strictly adopt the international warranty.
Warranty: Guarantee for one year or 1000 running hours (accord to whichever reach first) from shipment date.
During the guarantee period, guangling will provide the free easy-damaged spare parts for problems caused
by our quality of production or raw material, except the damageable spare parts caused by customer's incorrect man-
made operation.
After expiration, Guangling provides cost spare-parts maintenance for gensets .
FAQ
Q1: What is your MOQ of this item?
A: 1 pcs
Q2: What is the lead time?
A:2days after receiving your L/C or TT deposit.But if your order is some special engine and alternator, then the delivery time is
longer.
Q3: Is it able to make customer's own brand name?
A: We can be your OEM manufacture with your authorization of brand.
Q4: Where is your Loading Port?
A: Any port in China. Usually Fuzhou port.
Q5: What is your payment term?
A: We can accept T/T 30% in advance, and the balance 70% shall be paid before shipment or L/C at sight, L/C deferred payment terms
or west union.
Q6: What is your company's available production capacity?
A:1000 000000
For More details,can send us inqury to know Factory Pirce!