Mobile Trailer Solar LED Light Tower with Telescopic High Mast with Generator
It is normally used for night construction and other field operation in the sectors of municipal engineering, road, bridge, port, mining and construction etc. Meanwhile, it also used on the occasion of night rush repairs and disaster relief site. excellent performance, start easily, low oil consumption;Original design of the surface
Features
*Environmental protection;
*Advertisement can be painted in body of bollon light;
*Famous motor and generator, excellent performance, start easily;
*Metal halide lamp has long service life;
*Anti-fall, safe and solid;
*Hand-operated winch, lockable at any moment;
*Elevating frame is made of Stsainless steel square pipe;
*Elevating frame can rotate, east to light waving, overturn to intake, easy transport and store;
*Plastic treated, anti-rust, anti-corrosion and beautiful
Brand Name |
ONEW |
Lighting
Lamp Output |
200WX4 LED |
Luminous flux |
150000LM |
Lamp |
Philips metal halide lamp |
Elevator frame |
|
Lamp frame |
Three lifting lever |
Lamp frame extension |
4700mm |
Ascend and descend type |
By hand |
Slope |
<10° |
Anti-wind capacity |
<6 grade |
Engine |
Model |
Diesel 5KW |
Type |
Air-cooled, four strokes, single cylinder |
Diesel engine |
Power |
5.5HP |
Fuel tank capacity |
15L |
Continuous working hours |
12H |
Generator |
Type |
One-way alternator |
Frequency |
50/60HZ |
Maximum output |
6KVA |
Rated power |
5KVA |
Class of insulation |
B |
Weight |
230KG |
Our Services
Guangling strictly adopt the international warranty.
Warranty: Guarantee for one year or 1000 running hours (accord to whichever reach first) from shipment date.
During the guarantee period, guangling will provide the free easy-damaged spare parts for problems caused
by our quality of production or raw material, except the damageable spare parts caused by customer's incorrect man-
made operation.
After expiration, Guangling provides cost spare-parts maintenance for gensets .
FAQ
Q1: What is your MOQ of this item?
A: 1 pcs
Q2: What is the lead time?
A:2days after receiving your L/C or TT deposit.But if your order is some special engine and alternator, then the delivery time is
longer.
Q3: Is it able to make customer's own brand name?
A: We can be your OEM manufacture with your authorization of brand.
Q4: Where is your Loading Port?
A: Any port in China. Usually Fuzhou port.
Q5: What is your payment term?
A: We can accept T/T 30% in advance, and the balance 70% shall be paid before shipment or L/C at sight, L/C deferred payment terms
or west union.
Q6: What is your company's available production capacity?
A:1000 000000
For More details,can send us inqury to know Factory Pirce!